B12- 10
YMS
Custom colors, flat sheen
~1.30
33
148
Availability: | |
---|---|
This product is mainly prepared by acrylic modified alkyd resin, pigments, drier, and organic solvent with better performance than regular alkyd paint in outdoor applications. It features:
|
|
|
|
|
|
Appearance | Custom colors, flat sheen |
Density, kg/L | ~1.30 |
Volume solid, % | 33 |
Flammability (solid, gas) | Not available |
Solubility | Not available |
Viscosity | Kinematic 40 ℃ : >0.205 cm2/s (>20.5 cSt) |
VOC, g/L | ≤200 |
Theoretical spreading rate, g/m2 @ 32 µm dry film | 148 |
![]() | B12- 10 Advanced Interior Latex Paint Product PackagingPackaging: 25 kg in a 20-liter iron bucket or 180 kg in a 200-liter plastic drum. Shelf Life: 12 months If exceeding shelf life, the products shall be tested before using. |
![]() | ![]() | ![]() | ![]() |
Cement mortar | Plaster | Concrete | Masonry |
Product | Thickness | |
Putty: | B51-3 Exclusive Putty for Architectural Paint | 1mm |
Primer: | B51-2 Advance Acrylic Latex Sealing Primer | 0.1mm |
Topcoat: | B12- 10 Advanced Interior Latex Paint | 0.2mm |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
B12- 10 Advanced Interior Latex Paint
Instructions For Use
Substrate Treatment:
Remove all surface contamination by washing with an appropriate cleaner, rinse thoroughly and allow to dry. Existing peeled or checked paint should be scraped and sanded to a sound surface. Glossy surfaces should be sanded dull. Stains from water, smoke, ink, pencil, grease, etc. should be sealed with the appropriate primer/sealer. Recognize that any surface preparation short of total removal of the old coating may compromise the service length of the system.
Drywall:
Fill cracks and holes with patching paste/ spackle and sand smooth. Joint compounds must be cured and sanded smooth. Remove all sanding dust.
Masonry, concrete, cement, block:
All new surfaces must be cured according to the supplier’s recommendations usually about 30 days. Remove all form release and curing agents. Rough surfaces can be filled to provide a smooth surface. If painting cannot wait 30 days, allow the surface to cure 7 days and prime the surface with JIANBANG Concrete &Masonry Primer/Sealer.
Instructions for Use:
Thinner:
DI water or tap water (weight content ≤ 5 %, w./w.).
Cleaner:
DI water or tap water
Application methods:
Spraying, conventional spraying, brushing, rolling, troweling.
Spraying: nozzle diameter: 2-3 mm, air pressure: 0.3-0.6 Mpa.
Brush: Nylon / polyester.
Roller: 3/8" - 3/4" nap synthetic cover.
Maintenance period:
7 days.
![]() | |||
![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
This product is mainly prepared by acrylic modified alkyd resin, pigments, drier, and organic solvent with better performance than regular alkyd paint in outdoor applications. It features:
|
|
|
|
|
|
Appearance | Custom colors, flat sheen |
Density, kg/L | ~1.30 |
Volume solid, % | 33 |
Flammability (solid, gas) | Not available |
Solubility | Not available |
Viscosity | Kinematic 40 ℃ : >0.205 cm2/s (>20.5 cSt) |
VOC, g/L | ≤200 |
Theoretical spreading rate, g/m2 @ 32 µm dry film | 148 |
![]() | B12- 10 Advanced Interior Latex Paint Product PackagingPackaging: 25 kg in a 20-liter iron bucket or 180 kg in a 200-liter plastic drum. Shelf Life: 12 months If exceeding shelf life, the products shall be tested before using. |
![]() | ![]() | ![]() | ![]() |
Cement mortar | Plaster | Concrete | Masonry |
Product | Thickness | |
Putty: | B51-3 Exclusive Putty for Architectural Paint | 1mm |
Primer: | B51-2 Advance Acrylic Latex Sealing Primer | 0.1mm |
Topcoat: | B12- 10 Advanced Interior Latex Paint | 0.2mm |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
B12- 10 Advanced Interior Latex Paint
Instructions For Use
Substrate Treatment:
Remove all surface contamination by washing with an appropriate cleaner, rinse thoroughly and allow to dry. Existing peeled or checked paint should be scraped and sanded to a sound surface. Glossy surfaces should be sanded dull. Stains from water, smoke, ink, pencil, grease, etc. should be sealed with the appropriate primer/sealer. Recognize that any surface preparation short of total removal of the old coating may compromise the service length of the system.
Drywall:
Fill cracks and holes with patching paste/ spackle and sand smooth. Joint compounds must be cured and sanded smooth. Remove all sanding dust.
Masonry, concrete, cement, block:
All new surfaces must be cured according to the supplier’s recommendations usually about 30 days. Remove all form release and curing agents. Rough surfaces can be filled to provide a smooth surface. If painting cannot wait 30 days, allow the surface to cure 7 days and prime the surface with JIANBANG Concrete &Masonry Primer/Sealer.
Instructions for Use:
Thinner:
DI water or tap water (weight content ≤ 5 %, w./w.).
Cleaner:
DI water or tap water
Application methods:
Spraying, conventional spraying, brushing, rolling, troweling.
Spraying: nozzle diameter: 2-3 mm, air pressure: 0.3-0.6 Mpa.
Brush: Nylon / polyester.
Roller: 3/8" - 3/4" nap synthetic cover.
Maintenance period:
7 days.
![]() | |||
![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |