7-15days
200kg
10T/day
Shanghai,Qingdao,Guangzhou,Ningbo etc
Iron-red, Gray, Black
Matte, Flat
~1.4Kg/L (after mixing)
38℃
(60±2 )%
Use the power mixer to mix the main paint evenly, and then as you stir it, you add the hardener until you get to mix well. Generally, if the temperature below 10℃, it needs 30 min induction time; if the temperature over 10 ℃, it needs 15 min induction time.
Part A: Part B = 25:3
4.28m²/Kg (100um dry film thickness)
| Availability: | |
|---|---|
This product is a two-component thick film topcoat based on epoxy resin, anti-rust filler, amine adduct curing agent.It has the following characteristics:
|
|
|
|
| |
Color | Customized |
Gloss | Glossy on rough surface |
Density | ~1.2Kg/L(after mixing) |
Hardness | Epoxy glass flake curing agent |
Solid Volume | (60±2 )% |
Standard Film thickness | 100um dry film thickness (about 167um wet film thickness) |
Theoretical spreading rate | 5m²/Kg (100um dry film thickness) |
Full Cure | (23±2℃ )7d |
| Flash Point | 27℃ |
![]() | Epoxy Glass Flake Finish Product Packaging Packaging: part A:20 kg in a 20-liter iron bucket. part B:5 kg in a 6-liter iron bucket. Shelf Life: 12 months If exceeding shelf life, the products shall be tested before using. |
![]() | ![]() | ![]() | ![]() |
Chimney | Reactor | Storage tank | Port |
![]() | ![]() | ![]() | ![]() |
| Offshore platform | Pipeline | Sewage treatment equipment | Dust removal equipment |
| Product | Thickness | |
Primer: | Epoxy Glass Flake Anti-rust Paint | 2*100 µm (dry film thickness) |
| Topcoat: | Epoxy Glass Flake Finish | 2*50um (dry film thickness) |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
Substrate Treatment:
All surface to be coated shall be clean and dry. The surface shall be evaluated and treated according to ISO8504 standard.
For bare steel, it shall be sandblasted to reach Sa2.5(iso8501-1:2007) standard. Depending on the environment of the non-immersed part, grinding with power tools is acceptable but shall at least reach St2(iso8501-1:2007) standard.
For shop primed steel, the shop primer shall be clean, dry and approved.
For surface painted coatings, this product can apply only to clean, dry and good compatible primer.
Instructions for Use:
Mixing:
Use the power mixer to mix the main paint evenly, and then as you stir it, you add the hardener until you get to mix well. Generally, if the temperature is below 10℃, it needs 30 min induction time; If the temperature is over 10℃, it needs 15 min induction time.
Mixing ratio:
Part A: Part B=20:5
Thinner:
Exclusive paint thinner
Airless spray:
Nozzle tip: 0.020~0.028 inches
Spray pressure: 15~18Mpa
Thinner ratio: 0~15% (by weight of paint)
BrushRoller:
Recommended
Must achieve required thickness
![]() | |||
![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
This product is a two-component thick film topcoat based on epoxy resin, anti-rust filler, amine adduct curing agent.It has the following characteristics:
|
|
|
|
| |
Color | Customized |
Gloss | Glossy on rough surface |
Density | ~1.2Kg/L(after mixing) |
Hardness | Epoxy glass flake curing agent |
Solid Volume | (60±2 )% |
Standard Film thickness | 100um dry film thickness (about 167um wet film thickness) |
Theoretical spreading rate | 5m²/Kg (100um dry film thickness) |
Full Cure | (23±2℃ )7d |
| Flash Point | 27℃ |
![]() | Epoxy Glass Flake Finish Product Packaging Packaging: part A:20 kg in a 20-liter iron bucket. part B:5 kg in a 6-liter iron bucket. Shelf Life: 12 months If exceeding shelf life, the products shall be tested before using. |
![]() | ![]() | ![]() | ![]() |
Chimney | Reactor | Storage tank | Port |
![]() | ![]() | ![]() | ![]() |
| Offshore platform | Pipeline | Sewage treatment equipment | Dust removal equipment |
| Product | Thickness | |
Primer: | Epoxy Glass Flake Anti-rust Paint | 2*100 µm (dry film thickness) |
| Topcoat: | Epoxy Glass Flake Finish | 2*50um (dry film thickness) |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
Substrate Treatment:
All surface to be coated shall be clean and dry. The surface shall be evaluated and treated according to ISO8504 standard.
For bare steel, it shall be sandblasted to reach Sa2.5(iso8501-1:2007) standard. Depending on the environment of the non-immersed part, grinding with power tools is acceptable but shall at least reach St2(iso8501-1:2007) standard.
For shop primed steel, the shop primer shall be clean, dry and approved.
For surface painted coatings, this product can apply only to clean, dry and good compatible primer.
Instructions for Use:
Mixing:
Use the power mixer to mix the main paint evenly, and then as you stir it, you add the hardener until you get to mix well. Generally, if the temperature is below 10℃, it needs 30 min induction time; If the temperature is over 10℃, it needs 15 min induction time.
Mixing ratio:
Part A: Part B=20:5
Thinner:
Exclusive paint thinner
Airless spray:
Nozzle tip: 0.020~0.028 inches
Spray pressure: 15~18Mpa
Thinner ratio: 0~15% (by weight of paint)
BrushRoller:
Recommended
Must achieve required thickness
![]() | |||
![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |